Vancouver, B.C. – September 15th –Highbank Resources Ltd. (the “Company”) (TSX Venture: HBK) is pleased to announce that the crusher, wash plant and all associated equipment arrived on site during the weekend. In addition a larger excavator was shipped to accelerate the site preparation. With this equipment installed, work can commence on the production of aggregate stockpiles in preparation for shipping. This approach will increase timely shipping of aggregate, once the load out system has been installed. Pilings are currently in Surrey (Vancouver) and will have priority loading and trucking to Prince Rupert. Barging to the site will take place later this week. Canada LNG Export Conference & Exhibition (“Canada LNG”) Further to our news release of September 4th announcing that the Company will be exhibiting at Canada LNG in Calgary, Alberta- September 16th to 18th inclusive; some exciting presenters have been added to the conference program: Cynthia Farmer-Assistant Deputy Minister, Alberta Energy; Hajime Wakuda- Director General, JOGMEC; John Godbold- COO & Project Director, Bear Head LNG; and Dominique Gladelle- Vice President Upstream/LNG, Technip. Cambridge – Canadian Investor Conference Toronto 2014 (“CIC Toronto”) & Chatham On September 24th the Company will be presenting to significant investors and shareholders in Chatham, Ontario; followed by further exhibiting at the CIC Toronto on September 25th and 26th.