Vancouver, British Columbia, April 2, 2026 – 1911 Gold Corporation (“1911 Gold” or the “Company”) (TSXV: AUMB; OTCQX: AUMBF; FRA: 2KY) is pleased to provide additional assay results from the underground drill program at the Company’s wholly-owned operational and fully permitted True North Gold Project (“True North”), located in southeast Manitoba, Canada.

These assay results represent ten (10) drill holes for 1,464 metres (“m”) from the underground delineation drill program on the mineral resources outlined within the mine plan in the recent True North Preliminary Economic Assessment (“PEA”), in preparation for development and mining activities (see press release dated February 10, 2026, “1911 Gold Delivers Positive PEA for True North Highlighting Robust Economics with Low Capital Intensity and High Returns”).

Drilling Highlights:

  • Drilling results confirmed continuity of gold (“Au”) mineralization within the Hinge Zone (“Hinge”) V-810 vein as outlined in the PEA mine plan for the early years of mining, located adjacent to Level 16 (695 metres below surface).
  • Hinge Delineation Drill Program – the latest drill results reported complete this program for Hinge, with the following highlighted results:
  • UG16-26-038: Intersected 9.51 grams per tonne (“g/t”) Au over 3.50 m (at 133.80 m downhole depth), including 12.70 g/t Au over 0.70 m, and 30.70 g/t Au over 0.60 m
  • UG16-26-046: Intersected 12.00 g/t Au over 1.00 m (at 128.80 m downhole depth), and 7.44 g/t Au over 0.50 m (at 132.00 m downhole depth)
  • UG16-26-041: Intersected 6.71 g/t Au over 2.00 m (at 117.00 m downhole depth), including 11.40 g/t Au over 0.80 m
  • UG16-26-042: Intersected 5.78 g/t Au over 1.10 m (at 118.00 m downhole depth), including 6.46 g/t Au over 0.50 m
  • UG16-26-043: intersected 4.10 g/t Au over 1.40 m (at 112.90 m downhole depth), including 5.59 g/t Au over 0.70 m
  • Additional drilling is planned to test the extension of the V-810 vein at Hinge between the current resource and Level 16, located 25m down plunge

Shaun Heinrichs, President and CEO stated, “Drilling has confirmed mineralization within the targeted V-810 vein within Hinge, an area that will be considered for test mining activities later in the year. These additional results are in line with previous delineation drilling at Hinge with a consistent core of higher-grade gold mineralization approximately 40 m wide extending approximately 100 m down plunge. The ongoing drill program is focussed on infill and delineation drilling in areas that are included in the first years of mining within the PEA mine, as well as exploration and resource expansion drilling. We currently have two drills on surface and plan to mobilize a third underground drill rig over the next month which will continue to provide infill and resource expansion results as we expand our resource base in 2026 and advance towards the planned mine restart in 2027.”

The underground infill and delineation drill program has focused on two areas scheduled for early production in the PEA mine plan that are readily accessible from the existing Level 16 development. Current development drilling continues to focus on upgrading and delineating the resources for the initial years of the mine schedule and supporting the upcoming bulk sampling and test mining activities. The latest results reported conclude the current delineation drill program on the Hinge V-810 vein, with thirty-one (31) drill holes completed to date for a total of 4,608 m. Results from the delineation drilling on Hinge V-810 will be incorporated into the project database to improve the vein wireframe modelling and to update the resources and stope designs to support an optimized mine plan.

Exploration Drilling

Beyond the immediate mine plan, 1911 Gold has been testing new target areas within the True North mine footprint. This includes underground drilling on the new Shore target and the San Antonio Southeast (“SAM SE”) depth extensions, as well as testing the extensions of mineral resources included in the PEA mine plan. Additional underground drill results on the potential new resource targets and resource expansion areas will be released upon receipt of final assay results.

Two (2) surface drill rigs were mobilized in early February to test the near-surface extensions of gold mineralization previously intersected at the San Antonio West, SAM SE and Shore targets. Drilling is progressing on all targets, and additional results will be released as they become available.

Figure 1: Isometric View (looking NW) of True North Mine-Hinge Zone

Figure 2: Plan View-True North Mine (Level 16)-Hinge Delineation Drilling

Table 1: Select Significant Drill Results from Hinge Delineation Drill Program at True North

Target Area
(vein name)
Drill Hole
(number)
From
(m)To
(m)
Interval
(m)
Gold Grade
(g/t Au)
Type of Drilling
Hinge V-810 UG16-25-038 133.80 137.30 3.50 9.51 Delineation
Including 133.80 134.50 0.70 12.70 Delineation
And 136.70 137.30 0.60 30.70 Delineation
Hinge V-810 UG16-26-039 No Significant Results Delineation
Hinge V-810 UG16-26-040 121.80 122.30 0.50 6.15 Delineation
Hinge V-810 UG16-26-041 117.00 119.00 2.00 6.71 Delineation
Including 117.60 118.40 0.80 11.40 Delineation
Hinge V-810 UG16-26-042 118.00 119.10 1.10 5.78 Delineation
Including 118.60 119.10 0.50 6.46 Delineation
Hinge V-810 UG16-26-043 112.90 116.20 3.30 2.99 Delineation
Including 112.90 114.30 1.40 4.10 Delineation
Including 112.90 113.60 0.70 5.59 Delineation
Hinge V-810 UG16-26-044 No Significant Results Delineation
Hinge V-810 UG16-26-046 128.80 129.80 1.00 12.00 Delineation
UG16-26-046 132.00 132.50 0.50 7.44 Delineation
Hinge V-810 UG16-26-047 141.00 142.50 1.50 2.29 Delineation
Hinge V-810 UG16-26-048 113.30 114.30 1.00 2.51 Delineation

Notes:

  1. Intercepts above a cut-off grade of 2.25 g/t Au
  2. Maximum of 2.50 m internal dilution and no top capping applied
  3. Intervals represent drill core length and are considered to represent 60% to 90% of true widths
  4. Drill hole Information included in Table 3

Discussion of Results – Hinge (V-810) Infill and Delineation Drilling

The latest Hinge Zone (V-810) delineation drill results from the last ten (10) drill holes totaling 1,464 m confirmed the continuity of gold mineralization within proposed stopes outlined in the recent PEA mine plan. Drill holes were planned to intersect the modelled vein on a nominal 15 m spacing to upgrade indicated resources to the measured resource category. The V-810 vein modelled in this zone had an average width of 1.2 m, diluted to 1.5 m minimum width in the PEA mine plan

The V-810 vein is hosted by a dacitic lapilli tuff unit, characterized by northwest trending shear and extensional stockwork style veins and vein breccias subparallel to the stratigraphy and are predominantly comprised of white quartz with accessory Fe-carbonate and albite, containing thin bands of tourmaline- sericite-pyrite and chlorite. Gold is associated with pyrite, with free native gold also occurring. Geological interpretation and assay results for holes highlighted in this release support the definition of an approximate 120 m long and 100 m wide zone plunging N13E/52° hosted within the dacitic lapilli tuffs unit and the intersection of the regional mineralized Hinge shear zone.

Eight (8) of the ten (10) drill holes completed intercepted the vein, with overall average widths as expected including UG16-25-041 which intersected 6.71 g/t Au over 2.00 m (at 117.00 m downhole depth), including 11.40 g/t Au over 0.80 m; UG16-25-042 which intersected 5.78 g/t Au over 1.10 m (at 118.00 m downhole depth; and UG16-25-046 which intersected 12.00 g/t Au over 1.00 m (at 128.80 m downhole depth), and 7.44 g/t Au over 0.50 (at 132.00 m downhole depth). Data interpretation defines a classic “pinch-and-swell” geometry of shear hosted veins both on strike and vertically with a consistent core of higher-grade gold mineralization approximately 40 m wide extending approximately 100 m down plunge (see press release dated March 11, 2026, “1911 Gold Confirms Resource Continuity in Underground Infill and Delineation Drilling at True North”) which returned results including 10.03 g/t over 1.10 m Au (at 136.80 m downhole depth), including 14.50 g/t Au over 0.50 m in hole UG16-25-006; 10.79 g/t Au over 2.20 m (at 119.70 m downhole depth) in hole UG16-25-015, including 14.60 g/t Au over 1.10 m; 6.62 g/t Au over 3.40 m (at 135.60 m downhole depth), including 23.60 g/t Au over 0.70 m in hole UG16-25-017.

Vein wireframe update and assay results from the delineation program will support for the update resource estimate and the mine plan optimization for this area.

Additional drilling is planned to test the potential extensions of the Hinge V-810 vein above Level 16, which is located 25m down plunge.

Figure 3: Section AA’ (Looking West) – Hinge V-810 Vein Delineation Drilling
(Select Significant Results)

Figure 4: Section BB’ (Looking West) – Hinge V-810 Vein Delineation Drilling
(Select Significant Results)

Figure 5: Section CC’ (Looking West) – Hinge Vein V-810 showing Delineation
(Select Significant Results)

Figure 6: Inclined Long Section (Looking North)-Hinge V-810 Vein Infill and Delineation Drilling (Select Significant Results within Planned Stope Design)

Table 2: Select Significant Drill Results from Hinge Delineation Drill Program (Intercepts that occur outside of the modelled veins within the PEA mine plan)

Target Area
(vein name)
Drill Hole
(number)
From
(m)
To
(m)
Interval
(m)
Gold Grade
(g/t Au)
Type of Drilling
Hinge V-810 UG16-26-038 126.00 127.00 1.00 3.87 Delineation
Hinge V-810 UG16-26-039 88.20 89.30 1.10 3.26 Delineation
Hinge V-810 UG16-26-041 102.50 103.10 0.60 2.47 Delineation
Hinge V-810 UG16-26-041 103.90 104.70 0.80 2.64 Delineation
Hinge V-810 UG16-26-042 105.00 105.80 0.80 4.66 Delineation
Hinge V-810 UG16-26-048 81.70 82.60 0.90 2.49 Delineation
Hinge V-810  UG16-26-048 133.80 134.30 0.50 4.22 Delineation
Hinge V-810  UG16-26-048 142.90 144.00 1.10 2.42 Delineation

Notes:

  1. Intercepts above a cut-off grade of 2.25 g/t Au
  2. Maximum of 2.50 m internal dilution and no top capping applied
  3. Intervals represent drill core length and are considered to represent 60% to 90% of true widths
  4. Drill hole Information included in Table 3
  5. Newly intercepted veins not in the current resource model or PEA mine plan

A number of drill holes also intercepted mineralization outside of the currently modelled veins and which are not included in the PEA mine plan. Preliminary interpretation indicates a potential vein system parallel to the Hinge vein V-810, which occurs outside of the modeled wireframes supporting the 2024 mineral resource estimate and will be further interpreted and modelled to define potential resource additions (see technical report entitled “NI 43-101 Technical Report on the True North Gold Project, Bissett, Manitoba, Canada”, prepared by Lions Gate Geological Consulting Inc. and 1911 Gold, dated December 23, 2024). Further interpretation is ongoing to define potential mineralization continuity to support vein wireframe modelling.

The Company also wishes to clarify disclosure in its news release dated March 11, 2026. An interval disclosed in the “Drilling Highlights” on the first page, previously reported for drill hole UG16-25-006 as 10.03 g/t Au over 1.10 m (at 136.80 m downhole depth), including 12.91 g/t Au over 1.70 m, including 14.50 g/t Au over 0.50 m, should have been disclosed as 10.03 g/t Au over 1.10 m (at 136.80 m downhole depth), including 14.50 g/t Au over 0.50 m (where the information is reported correctly in Table 1 of the release). This correction does not materially impact the interpretation of the drill results.

Table 3: True North Drill Hole Details (UTM NAD83 Zone 15)

Drill Hole
(Number)
Target
(Name)
Northing*
(m)
Easting*
(m)
Elevation
(masl)
Azimuth
(°)
Inclination
(°)
Depth
(m)
UG16-26-038 Hinge V-810 313217 5656163 -465 22 29 150
UG16-26-039 Hinge V-810 313217 5656163 -465 28 33 150
UG16-26-040 Hinge V-810 313216 5656163 -465 16 33 144
UG16-26-041 Hinge V-810 313216 5656163 -464 9 35 141
UG16-26-042 Hinge V-810 313216 5656163 -464 14 39 144
UG16-26-043 Hinge V-810 313216 5656163 -464 20 49 150
UG16-26-044 Hinge V-810 313215 5656163 -465 356 30 141
UG16-26-046 Hinge V-810 313216 5656163 -465 10 14 141
UG16-26-047 Hinge V-810 313217 5656163 -465 19 18 156
UG16-25-048 Hinge V-810 313217 5656163 -464 27 43 147

Qualified Person Statement

The scientific and technical information in this news release has been reviewed and approved by Mr. Michele Della Libera, P.Geo, Vice-President Exploration of 1911 Gold Corporation, who is a “Qualified Person” as defined under NI 43-101.

Quality Assurance/Quality Controls (QA/QC)

Whole core is sampled for the delineation drilling, with samples placed in plastic sample bags, labelled, sealed and despatched for analysis. Batches are shipped to Activation Laboratories Ltd. (Actlabs), in Thunder Bay, Ontario for sample preparation and analysis. Samples are dried, crushed to 2mm and a 1 kg split is pulverized to -200 mesh. Gold analysis is completed by fire-assay with an atomic absorption finish on 50 grams of prepared pulp. Samples returning values equal or greater to 10.00 g/t are reanalysed by fire assay with a gravimetric finish. Total gold analysis (Screen Metallic Sieve) is conducted on highly mineralized samples or the presence of visible gold. Certified gold reference material samples are inserted every 20 samples and blank samples at intervals of one in every 50 samples, with additional blanks inserted after samples hosting visible gold. Repeat third-party gold analyses for 5% of all submitted sample pulps are analyzed at ALS-Chemex Laboratory, North Vancouver, Canada.

About 1911 Gold Corporation

1911 Gold is an advanced gold explorer and developer focused on its 100%-owned True North Gold Project in the Archean Rice Lake Greenstone Belt in Manitoba, Canada. The Company controls a large, highly prospective ~62,000-hectare land package with numerous past-producing gold operations within trucking distance of the fully built and permitted True North mine and mill complex. 1911 Gold is positioning itself to restart operations in 2027 and offers a unique, near-term production opportunity with significant exploration upside. The strategy is to build a district-scale gold mining operation around a central, and readily expandable infrastructure complex to support a socially and environmentally responsible, long-term mining operation with little development risk and a growing mineral resource base.

1911 Gold’s True North complex and the exploration land package are located within and among the First Nation communities of the Hollow Water First Nation and the Black River First Nation. 1911 Gold looks forward to maintaining open, cooperative, and respectful communications with all of our local communities and stakeholders to foster mutually beneficial working relationships.

ON BEHALF OF THE BOARD OF DIRECTORS
Shaun Heinrichs
President and CEO

For further information, please contact:

Shaun Heinrichs
Chief Executive Officer

(604) 674-1293
ir@1911gold.com
www.1911gold.com

ILR4

NationTalk Partners & Sponsors Learn More